| Title
and Location |
|
BRINE
PROCESS SECONDARY CONTAINMENT,
Chemical Processing Facility, Maine |
| Project
Description |
|
Multi-phase
project to relocate process equipment and piping within a concrete
containment structure. Components include FRP tanks and piping and
titanium pumps and equipment for 1500 gpm, 180 degree F brine
stream, plus precoat and sludge systems. |
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer |
| Employer |
|
Enterprise
Engineering, Inc. |
| |
|
|
| Title
and Location |
|
UNIT
5 DISTRICT HEAT STEAM TIE LINE
Power Plant, Alaska |
| Project
Description |
|
Provision
of 260' of 12" steam piping for cogeneration plant low pressure
steam re-route. |
| My
Role and Accomplishments of Note |
|
Assisting
Mechanical Engineer: Performed
piping flexibility/restraint analysis using CAESAR-II software
program. |
Employer
|
|
Enterprise
Engineering, Inc. |
TOP
|
|
|
| Title
and Location |
|
RELOCATE
COOLING PUMPS
Department of Defense Facility, Maine |
| Project
Description |
|
Relocate
vertical turbine pumps into new building and repair concrete
pier. Pumps transfer sea water for cooling large electical equipment.
|
| My
Role and Accomplishments of Note |
|
Design
Manager and Mechanical Engineer for latter half of project.
Helped re-focus and complete a project which had languished
for some time. |
| Const.
Cost |
|
$590,000
|
| Employer |
|
Enterprise
Engineering, Inc. |
TOP
|
|
|
|
|
|
| Title
and Location |
|
WAX
HANDLING SYSTEM
Candle Maker, Maine |
|
|
| Project
Description |
|
Provision
of stainless steel piping system for receiving wax from tanker
trucks, storing the wax in two 10,500 gallon tanks and transferring
wax to the candle production line. Tanks and piping were heated to maintain
flowability of wax. |
|
|
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer |
| Const.
Cost |
|
$200,000
|
| Employer |
|
Enterprise
Engineering, Inc. |
TOP
|
|
|
|
|
|
| Title
and Location |
|
DESUPERHEATING
PIPING MODIFICATIONS
Paper Mill, Maine |
| Project
Description |
|
Fast-track
study and upgrade of desuperheater water supply control system
at industrial cogeneration plant.
Lack of documentation necessitated thorough investigation
of numerous water destinations. |
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer. |
| Const.
Cost |
|
$50,000
|
| Employer |
|
Enterprise
Engineering, Inc. |
TOP
|
|
|
|
|
|
| Title/Location |
|
STEAM
LINE REPLACEMENT
Paper Mill, Maine |
| Project
Description |
|
Design
analysis, using Triflex computer program, of new 12" diameter
superheated steam line, steam conditioning valve and 20"
diameter 160 psig header. |
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer. |
| Const.
Cost |
|
$300,000
|
| Employer |
|
Enterprise
Engineering, Inc. |
TOP
|
|
|
|
|
|
| Title
and Location |
|
BLOW
LINE REPLACEMENT
Paper Mill, Maine |
| Project
Description |
|
Developed
installation drawings, as subcontractor to the piping vendor,
for replacement of a portion of two 18" lines for pneumatic
conveyance of tree bark and rubber tire chips. |
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer: Received compliments for accuracy of work
from the mill and the installation contractor. |
| Const.
Cost |
|
$600,000
|
| Employer |
|
Enterprise
Engineering, Inc. |
TOP
|
|
|
|
|
|
| Title
and Location |
|
ACID
TANK RELOCATION
Paper Mill, Maine |
|
|
| Project
Description |
|
Study
and design of new sulfuric acid storage and dispensing system
for mill wastewater treatment facility.
Included new instrumentation and controls for pH control
of wastewater. |
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer. |
| Const.
Cost |
|
$250,000
|
| Employer |
|
Enterprise
Engineering, Inc. |
TOP
|
|
|
|
|
|
| Title
and Location |
|
SOLVENT
ADDITION SYSTEM FOR BLDGS 1019, 1020, 1024 & 1026
Department of Defense Facility, Maryland |
| Project
Description |
|
System
for storage and automatic metering of solvents, plasticizers and
nitro-esters to two propellant mixing machines.
Incorporated Underground Storage Tanks, PLC-based control
system, plasticizer heating system and batch weighing system. |
| My
Role and Accomplishments of Note |
|
Project
Manager and Lead Mechanical Engineer until I left firm to move
to Maine. |
| Const.
Cost |
|
$720,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
UPGRADE
BLDG 1649 FOR HOPPER CLEANING
Department of Defense Facility, Maryland |
| Project
Description |
|
Provision
of systems for rinsing and drying solid propellant hoppers. Also
provided system for recycling rinse water. Utilities included provision of approximately
one mile of exterior steam and compressed air piping. |
| My
Role and Accomplishments of Note |
|
Project
Manager / Lead Mechanical Engineer |
| Const.
Cost |
|
$288,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
COMPRESSED
AIR DRIER BOOSTER HEATERS
Department of Defense Faciltiy, Virginia |
| Project
Description |
|
Provision
of 75 kW electric heaters and electronic control systems on three
existing desiccant-type air dryers for shipyard air distribution
system. |
| My
Role and Accomplishments of Note |
|
Project
Manager / Lead Mechanical Engineer |
| Const.
Cost |
|
$47,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
REPLACE
QUENCH TANKS
Department of Defense Facility, Virginia |
| Project
Description |
|
Provision
of quench system consisting of oil tank, jacketed water tank,
oil pump and piping (all in a secondary containment structure)
for a metallurgical heat treatment process. |
| My
Role and Accomplishments of Note |
|
Project
Manager / Lead Mechanical Engineer |
| Const.
Cost |
|
$150,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
MISCELLANEOUS
MODIFICATIONS AND INSTALLATIONS TO OPERATING BUILDINGS
Department of Defense Facility, Maryland |
| Project
Description |
|
Work
included 1) HVAC for a munitions testing lab, 2) safety upgrades
to a rocket test bay door, 3) compressed air drier for process
controls, 4) temperature/humidity control system for propellant
milling process and 5) propellant mixing bay ventilation. |
| My
Role and Accomplishments of Note |
|
Project
Manager / Lead Mechanical Engineer |
| Const.
Cost |
|
$255,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
MODIFICATIONS
TO PNC FACILITY
Department of Defense Facility, Maryland |
| Project
Description |
|
Performed
energy conservation study on existing process at Plastisol Nitrocellulose
pilot plant. Also provided
wastewater treatment system, local/general ventilation systems
and heat trace of heptane piping. |
| My
Role and Accomplishments of Note |
|
Project
Manager / Lead Mechanical Engineer |
| Const.
Cost |
|
$337,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
VARIOUS
MECHANICAL PROJECTS
Department of Defense Facility, Virginia |
| Project
Description |
|
Work
included provision of 1) HVAC for office space, 2) underground
steam lines, 3) jockey pump for base salt water system and 4)
heating system for low-level nuclear waste storage building. |
| My
Role and Accomplishments of Note |
|
Project
Manager / Lead Mechanical Engineer |
| Const.
Cost |
|
$175,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
PROCESS
ENERGY CONSERVATION STUDIES
Soybean Processing Facility, Virginia |
| Project
Description |
|
Investigated
economics of replacing electric motors with steam turbines on
various equipment and optimized steam usage of degumming process. |
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer |
|
|
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
REPAIR
POWER HOUSE, BLDG 873
Department of Defense Facility, Maryland |
| Project
Description |
|
Provision
of two steam conditioning valves in an existing steam cogeneration
plant. |
| My
Role and Accomplishments of Note |
|
Project
Manager / Lead Mechanical Engineer |
| Const.
Cost |
|
$200,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
REPLACE
HEATING CONTROL SYSTEM, BLDGS 727, 728, 729 & 731
Department of Defense Facility, Maryland |
| Project
Description |
|
Provision
of PLC-based control systems and connections to existing pneumatic
systems for controlling propellant curing processes.
Included central micro-computer and overhead communication
cable for remote monitoring and programming of controllers. |
| My
Role and Accomplishments of Note |
|
Project
Manager and Lead Instrumentation Engineer.
I developed a performance/design specification for the
systems which procured the installation/interconnection of owner
furnished PLC's at a competitive price. |
| Const.
Cost |
|
$120,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
| Title
and Location |
|
REPAIR
ASH GRATE AND HOPPER SYSTEMS, BLDG Z-309
Department of Defense Facility, Virginia |
| Project
Description |
|
Provision
of hydraulic drive systems and controls for moving ash grates
in refuse-burning steam plant. |
| My
Role and Accomplishments of Note |
|
Lead
Mechanical Engineer |
| Const.
Cost |
|
$83,000
|
| Employer |
|
Clark-Smith
Associates |
TOP
|
|
|
|
|
|
|
|
|
|
|
|